Search results

1 – 10 of 14
Article
Publication date: 25 November 2020

Kehinde Alade and Abimbola Olukemi Windapo

Globally, the business organisations are experiencing a transformation due to the Fourth Industrial Revolution (4IR). The need for an effective 4IR leadership has placed new…

1624

Abstract

Purpose

Globally, the business organisations are experiencing a transformation due to the Fourth Industrial Revolution (4IR). The need for an effective 4IR leadership has placed new demands on organisations to develop and select leaders to effectively lead the organisations in the 4IR era. Hence, it becomes important to understand the attributes for an effective 4IR leadership. This study examines the relationships between leadership styles, leadership traits, leadership intelligence and effective 4IR leadership to empirically validate the effective 4IR leadership framework that was conceptualised. The hypothesised relationships from the framework were tested using a survey of 416 senior construction executives across the nine provinces of South Africa.

Design/methodology/approach

To achieve the study objectives, an online survey was sent to construction firms across the nine provinces of South Africa. “Construction”, for the purpose of this study comprised building and civil engineering firms listed on the construction industry development board (cidb) register of contractors in South Africa. The target group was the upper echelon executives, i.e. Chairman, CEOs, managing directors and chief operating officers, and the survey was directed to contact e-mail of the study samples. The professional service providers (architects, consultants and surveyors) were not part of the survey sample. The database of the organisational leaders was obtained from the cidb. The online survey was created on the 23rd of August 2019 and closed on the 23rd of April 2020, thereby making the duration of the survey eight months. The total number of respondents at the time of closure of the survey was four hundred and sixteen (416). Structural equation modeling (SEM) was used for the analysis of the results.

Findings

This study validates the effective 4IR leadership framework as proposed by Alade and Windapo (2019) by empirically examining relationships between leadership styles, leadership traits, leadership intelligence and effective 4IR leadership. The findings from this study have shown that effective 4IR leadership is positively associated with leadership styles, leadership traits and leadership intelligence. Hence, an effective 4IR leader must spread the knowledge and understanding of the 4IR opportunities and threats in the organisations. The leader must ensure that the executives in the construction organisation become change conversant and ensure that the employees acquire 4IR skills. Multiple leadership intelligence is essential to effective 4IR leadership. These multiple intelligence are the ability to adapt knowledge and skills to different situations, ability to handle interpersonal relationships judiciously, a high level of understanding, ability to process and analyse information and ability to utilise knowledge from many disciplinary boundaries.

Research limitations/implications

This study is focused on construction business organisations in South Africa. As such, similar studies on 4IR leadership effectiveness can be carried out in other countries and across other organisations. Future studies should also consider using a case study approach specifically focused on organisations with high implementations of 4IR technologies. Interacting with the leaders of such organisations and their employees will give a broader perspective in understanding the reasons of their effectiveness.

Practical implications

The leadership of construction organisations must partner with the academia, industry players and team members in their efforts to implement 4IR in their organisations. Also, the existence of a positive association between leadership traits and effective 4IR leadership implies that to ensure a 4IR-driven work process in construction organisations, the leadership must embrace disruption and quickly respond to change. Further, it can be concluded from the findings of this study that appropriate leadership styles are required for effective 4IR leadership. The appropriate leadership style for effective 4IR leadership requires the leadership of construction organisations to delegate some of the 4IR function. The 4IR function must be performed based on the challenges that are associated with 4IR. The positive correlation between leadership intelligence and leadership styles makes it possible to conclude that the competencies of leadership of construction organisations in a 4IR-driven change depend on the level of leadership intelligence of the executives of construction organisations. It is evident that 4IR will change the business environment; hence, leadership intelligence is required to adapt construction organisations to the change dynamics. This study has provided information on what 4IR leadership entails in construction organisations. The study has contributed a framework for ensuring effective and smooth flow 4IR implementation in construction organisations through a purposeful leadership that combines leadership styles, leadership traits and leadership intelligence.

Social implications

This research will be useful to government agencies and board members of construction organisations, in appointing leaders to see the construction industry and organisations perform better in the 4IR era. Young individuals who are also aspiring to take on leadership role in the industry will benefit from this study.

Originality/value

This study is a new and original research that seeks to investigate the need for an effective 4IR leadership in construction business organisations. Construction as an industry is usually criticised for her slow response to change. Since leadership is required to drive the change agenda, this study examines the relationships between leadership styles, leadership traits, leadership intelligence and effective 4IR leadership to empirically validate the effective 4IR leadership framework that was conceptualised.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 3 April 2017

Luqman Oyekunle Oyewobi, Abimbola Olukemi Windapo and James Olabode Bamidele Rotimi

Literature suggests that there are sets of common variables that are capable of explaining organisational performance differentials. These variables are used to examine…

Abstract

Purpose

Literature suggests that there are sets of common variables that are capable of explaining organisational performance differentials. These variables are used to examine performance variance and its contribution to organisation profitability. Therefore, the purpose of this paper is to examine the determinants of large construction organisations’ performance in South Africa using a partial least squares path analytic method.

Design/methodology/approach

This study examines the interrelationship between a number of constructs, namely, organisational characteristics, resources/capabilities, competitive strategies, business environment and performance, using a questionnaire survey to obtain data from 72 large construction organisations in South Africa. Using a path analytic approach, the paper examines the relationship between the constructs discussed in the study.

Findings

The findings from the analysis of the data show that organisational characteristics do indeed influence the performance of organisations, and that the business environment is capable of moderating the relationship between competitive strategies and performance. The results, however, indicate that organisations that combine sustained organisational characteristics and strategy tend to experience high performance over those that do not.

Originality/value

The study findings have implications for management practice, as it could help managers of construction organisations to acknowledge the influence of organisational characteristics, unique resources/capabilities, competitive strategies and business environment as sources of competitive advantage. The study contributes to the current debate on the causes of performance differentials among large construction organisations.

Details

Journal of Financial Management of Property and Construction, vol. 22 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Open Access
Article
Publication date: 16 October 2023

Emmanuel Dele Omopariola, Abimbola Olukemi Windapo, David John Edwards, Clinton Ohis Aigbavboa, Sunday Ukwe-Nya Yakubu and Onimisi Obari

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective…

Abstract

Purpose

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective project cash flow process. However, scant research has been undertaken to empirically establish the cash flow performance and domino effect of APS on project and organisational performance.

Design/methodology/approach

The epistemological design adopted a positivist philosophical stance augmented by deductive reasoning to explore the phenomena under investigation. Primary quantitative data were collected from 504 Construction Industry Development Board (CIDB) registered contractors (within the grade bandings 1–9) in South Africa. A five-point Likert scale was utilised, and subsequent data accrued were analysed using structural equation modelling (SEM).

Findings

Emergent findings reveal that the mandatory use of an APS does not guarantee a positive project cash flow, an improvement in organisational performance or an improvement in project performance.

Practical implications

The ensuing discussion reveals the contributory influence of APS on positive cash flow and organisational performance, although APS implementation alone will not achieve these objectives. Practically, the research accentuates the need for various measures to be concurrently adopted (including APS) towards ensuring a positive project cash flow and improved organisational and project performance.

Originality/value

There is limited empirical research on cash flow performance and the domino effect of APS on project and organisational performance in South Africa, nor indeed, the wider geographical location of Africa as a continent. This study addresses this gap in the prevailing body of knowledge.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 18 August 2020

Abimbola Olukemi Windapo, Oluseye Olugboyega and Sunday Odediran

This study aims to investigate the impacts of procurement strategies on the growing proportion of construction small- and medium-sized enterprises (SMEs) and whether the size of…

1333

Abstract

Purpose

This study aims to investigate the impacts of procurement strategies on the growing proportion of construction small- and medium-sized enterprises (SMEs) and whether the size of the construction company moderates the effect.

Design/methodology/approach

This study adopted a quantitative research approach and a cross-sectional questionnaire survey in achieving its objectives. The survey requires the respondent to identify both the most successful and most outstanding project that the respondent was involved in between 2010 and 2016.

Findings

The study found that only traditional and management-oriented procurement strategies ensure the achievement of all growth plans for construction SMEs in South Africa; and that medium-sized construction enterprises achieve social growth such as community empowerment, managerial skills and advancement on the cidb Register of Contractors.

Practical implications

The findings of the study imply that policymakers should base their decisions regarding macroeconomic issues and growth plans for construction SMEs on the internal and external factors such as differences in the sizes of construction SMEs and differences in the suitability of procurement strategies affecting the growth of construction SMEs.

Originality/value

In past studies, the diversity amongst SMEs is often overlooked and SMEs are erroneously assumed to share similar objectives, possess equal capabilities and face challenges of the same magnitude. The original contribution of this study is shown in the investigation of the moderating effect of SMEs’ diversity (in terms of company size) on their growth proportion as influenced by procurement strategies.

Details

Journal of Financial Management of Property and Construction , vol. 25 no. 3
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 17 October 2016

Luqman Oyekunle Oyewobi, Abimbola Olukemi Windapo, James Olabode Bamidele Rotimi and Richard Ajayi Jimoh

The purpose of this paper is to examine the possible moderating role of organisational characteristics (organisational structure, management style and decision-making style) in…

3802

Abstract

Purpose

The purpose of this paper is to examine the possible moderating role of organisational characteristics (organisational structure, management style and decision-making style) in the relationship between strategy and organisational performance among large construction organisations in South Africa.

Design/methodology/approach

The study adopted a quantitative research approach using a questionnaire survey to obtain data from 72 large construction organisations in South Africa. Using hierarchical multiple regression, the paper examines the relationship between the constructs discussed in the study.

Findings

The internal characteristics of the organisation form the vital basis for achieving optimal performance. The results obtained from the analysis revealed that decision-making style directly influences the measure of organisational effectiveness, while it could also be inferred that organisational characteristics partly moderate the relationship between competitive strategy and organisational performance. The findings indicate that internal characteristics is one of the means through which organisational strategic factors and contextual aspects are organised to achieve greater organisational performance levels.

Originality/value

The findings have theoretical implications for strategic management literature in construction as it extends the scope of research on strategic management from assessing a set of individual management practices to evaluating a complex mechanism that connects internal characteristics and competitive advantage. It is believed that this study will contribute positively to the role of organisational characteristics in the competitive strategy-performance relationships in large construction organisations in South Africa and to the ongoing discussion on emerging strategic management issues in construction.

Article
Publication date: 10 June 2020

Oluseye Olugboyega, David J. Edwards, Abimbola Olukemi Windapo, Emmanuel Dele Omopariola and Igor Martek

Research into project success (PS) has a long pedigree as has research into the impact of building information modelling (BIM) on projects. Yet, despite the many revealed…

1016

Abstract

Purpose

Research into project success (PS) has a long pedigree as has research into the impact of building information modelling (BIM) on projects. Yet, despite the many revealed advantages BIM is known to deliver to projects, the relationship between the level of BIM application within a project, BIM's ability to impact a project at that level and the consequent effectiveness and range of success factors BIM is able to bestow across levels remains unmapped. Given the importance of evaluating the success of BIM-based construction projects (BBCPs) and the necessity to ensure the continual improvement of the BIM process, there is a need to identify the relationship between the level of BIM employed on a project and the specific PS factors that BIM is able to impact at that level.

Design/methodology/approach

This study puts forward a conceptual model for evaluating the success of BBCPs. A thematic synthesis approach is taken, using Scopus and other databases, and retrieving relevant articles from some 50 journals.

Findings

Eight success criteria for BBCPs were extracted and categorised according to BIM's ability to impact them across four levels of project application. Mapping BIM's variable impact at these four levels against the eight success factors produces a model for evaluating the PS of BBCPs. The model posits that the success of a BBCP is a function of the extent to which BIM is applied to the project. Moreover, the findings indicate that an increase in the number of PS criteria (PSC) for a BBCP is a derivative of BIM effectiveness, and not BIM impact.

Originality/value

This work constitutes seminal research to examine the concept of PS and PSC for BBCPs with the view to developing a model for evaluating the PS of BBCPs.

Details

Smart and Sustainable Built Environment, vol. 10 no. 4
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 23 November 2021

Emmanuel Dele Omopariola, Abimbola Olukemi Windapo, David J. Edwards and Nicholas Chileshe

Construction companies require meticulous and thorough financial planning to ensure business survival in an increasingly competitive global market. Past studies assert that cash…

Abstract

Purpose

Construction companies require meticulous and thorough financial planning to ensure business survival in an increasingly competitive global market. Past studies assert that cash flow management is also crucial to meeting project and organisational performance expectations. However, the link between an advance payment system (APS), cash flow and project performance has hitherto received scant academic attention. Therefore, this study aims to investigate the attributes and impact of APS on cash flow, project and organisational performance. This study surveyed all registered contractors listed in Grades 1–9 on the Construction Industry Development Board Register of Contractors in South Africa.

Design/methodology/approach

This study adopted an empirical epistemological design and deductive reasoning to analyse primary data collated via a questionnaire data collection instrument. Summary statistical and regression analysis were used to explore data garnered.

Findings

This study found that key significant attributes of APS in South Africa were payment of balance to the contractor upon project delivery; advance payment to contractors before the commencement of the work; and payment to contractors as agreed. This study proffers that project performance in terms of cost, time and quality performance is highly and positively supported by APS. Moreover, APS positively supports the efficiency, competitiveness and profitability of construction organisations. Cumulatively, these findings confirm that APS attributes in South Africa conforms to the global attributes of APS. The research concludes that client use of APS on projects improves the likelihood of attaining improved quality and time performance. This paper concludes with a recommendation that both public and private clients consider the option of an APS as the ideal payment system to support project and organisational performance.

Originality/value

To the best of the authors’ knowledge, this work constitutes the first attempt to explore the linkages between an APS, cash flow and project performance in South Africa and seeks to engender wider polemic debate and further discussion among industry stakeholders.

Details

Journal of Financial Management of Property and Construction , vol. 27 no. 3
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 27 April 2022

Nnedinma Umeokafor, Abimbola Olukemi Windapo, Patrick Manu, Ikechukwu Diugwu and Hasan Haroglu

Given the complexities in improving safety in the construction industry globally, which is exacerbated by the complex safety environment in developing countries (DCs), prevention…

Abstract

Purpose

Given the complexities in improving safety in the construction industry globally, which is exacerbated by the complex safety environment in developing countries (DCs), prevention through design (PtD) has been established to improve occupational safety and health (OSH) where applied. However, it has received very little attention in DCs and the extant literature with limitations. Using Nigeria as a case study, the current study advances the understanding of PtD in DCs by investigating the critical barriers to PtD and other potential OSH responsibilities of designers in the construction industry.

Design/methodology/approach

Twenty-eight semi-structured interviews and e-interviews of architects, builders and civil engineers in Nigeria were analysed using the six-phase thematic analysis. To improve the trustworthiness of the research, triangulation, peer-debriefing, refining the interview protocol and thick detailed description were done.

Findings

The study's findings question the extant general knowledge and understanding of PtD among clients and designers and its technical aspect among designers where it is skewed to structural safety and omitted in universities' curricula. This explains the inconclusive findings of existing studies on why there is a high level of awareness of PtD but a low level of implementation. There is little client support for PtD, and designers have limited influence on clients in terms of it. The fear of liability from PtD is exacerbated by the limited legal system and lack of adequate legislation in the country. The demotivating attitudes of clients and contractors towards designers in terms of PtD are also reported, just as there are project delivery barriers such as traditional procurement not supporting PtD as design and build procurement does.

Social implications

For the sustainable growth in the practice of PtD, the increased and improved quality of education and awareness of PtD is needed but this must focus on instilling a robust understanding of it among designers based on the local context. This educational requirement can be supported by statute.

Originality/value

Through qualitative data, the findings explain and offer insight into the inconclusive findings in the extant studies on PtD in Nigeria. Also, it contributes to improving health and safety by advancing the understanding of the critical barriers to PtD and other potential OSH responsibilities of designers in D Nigeria's construction using qualitative data.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 7
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 7 February 2017

Abimbola Olukemi Windapo and Astrette Cloete

This paper aims to examine briefing practices and whether these are related to the quality of brief documents and client satisfaction in constructed health-care facilities in…

Abstract

Purpose

This paper aims to examine briefing practices and whether these are related to the quality of brief documents and client satisfaction in constructed health-care facilities in South Africa. The rational for the examination stems from the view held by scholars that the briefing process is critical to the success of projects, as well as client/user satisfaction in the constructed facility, and also because of undocumented reports of client/end-user dissatisfaction in constructed health-care facilities in South Africa.

Design/methodology/approach

The research process consisted of a literature review to identify existing briefing framework and practices in use applicable to facilities. This was supported by an exploratory case study of a recently completed public hospital in East London, South Africa. Data collection for the study was undertaken by means of conducting semi-structured interviews with two groups consisting of client representatives and the technical design team on the project.

Findings

The research established that in the context of this case study, inadequate client consultation took place, not all design consultants were adequately involved in the development of the project brief, limited use was made of a specific briefing framework in developing the project brief and that despite these shortcomings in the briefing process followed, a comprehensive good quality briefing document was produced and the client was satisfied with the health-care facility constructed.

Research limitations/implications

The results of this study are generalizable with health-care facilities only. As such, research inferences and projections can only be made within this set and may not necessarily be applicable to the wider construction sector or to all projects within this sector.

Practical implications

The implications of this research are applicable to constructed health-care facilities. Practical inferences include the need to acknowledge that there is a need for a briefing framework, which should outline the involvement of all design consultants and client representatives when developing the project briefs for health-care facilities. The briefing framework is proposed for use in addressing the shortcomings in the briefing processes and practices and will also help the client in the choice of a brief process and practice which will comprehensively capture their requirements, give clear directives/information to the design consultants and will result in higher levels of end-user/patient satisfaction in the constructed health-care facility.

Social implications

Clients and allied professionals in charge of health-care facilities’ construction are encouraged to consider the implementation of a standard framework for use in the briefing process. This reflection should encourage engagement through formative legislative provision and transparent awareness campaigns.

Originality/value

This work is original insofar, as it directly addresses the alignment of briefing practices to quality of brief documents and client satisfaction in constructed health-care facilities within the context of the South African construction industry. However, similar exercises have been undertaken on briefing practices in the wider construction sector.

Details

Facilities, vol. 35 no. 1/2
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 29 October 2021

Oluseye Olugboyega and Abimbola Olukemi Windapo

The purpose of this paper is to investigate the barriers that are constituting significant obstructions to preliminary and sustained BIM adoption in the South African construction…

Abstract

Purpose

The purpose of this paper is to investigate the barriers that are constituting significant obstructions to preliminary and sustained BIM adoption in the South African construction industry.

Design/methodology/approach

Implementation Process Theory was used to develop the theoretical model of barriers to continuous and consistent BIM adoption. This enabled the formulation of two hypotheses, the identification of two sub-constructs (barriers to preliminary BIM adoption and barriers to sustained BIM adoption), and five variables (resources, knowledge, work process, organisational and planning barriers), which were validated using structural equation modelling (SEM).

Findings

The SEM results show pieces of evidence that validate the hypotheses in the theoretical model. The path analysis confirms that the two sub-constructs and five variables are statistically significant.

Research limitations/implications

This research extends the postulations on the barriers to BIM adoption by demonstrating that organisational challenges and planning difficulties constitute barriers to sustained BIM adoption in the South African construction industry.

Practical implications

The findings of this research are useful in understanding the planning scope and organisational requirements towards continuous and consistent BIM adoption in the South African construction industry.

Originality/value

The difficulties with BIM adoption are the issues with the performance of BIM on projects and are the major reason for the non-consistent adoption of BIM on projects. Having difficulties adopting BIM on projects suggests that BIM adoption is majorly on a preliminary or trial basis in the developing countries. This research tests this theory by proposing two types of BIM adoption and their associated barriers.

Details

Construction Innovation , vol. 22 no. 4
Type: Research Article
ISSN: 1471-4175

Keywords

1 – 10 of 14